ZY6112竖井管道垂直燃烧试验机
Shaft pipe vertical burning test machine
UL 1666竖井管道垂直燃烧试验机是目前zui为热门的产品,同时也是我司zui为优势的产打产品之一,曾与四川消防研究院、中国标准化研究院等七千多家省市质检院是我们的合作客户。
UL 1666 vertical shaft pipeline burning machine is currently the most popular products, at the same time also is one of our most advantage products within the play, with sichuan fire research institute, China academy of standardization is more than seven thousand cities and provinces such as quality inspection institute cooperation of our customers.
一.适用范围:Scope of application:
适用于楼与楼层间管道内配线及升降机用电缆燃烧性能的评定。
Suitable for floor and floor wiring between the pipe and elevator with cable combustion performance evaluation.
二.符合标准:Conform to the standard:
符合UL1666<<Test for flame propagation height of electrical and optical-fiber cables installed vertically in shafts>>试验标准
Meet UL1666 < < Test for flame propagation height of electrical and optical - fiber cables installed vertically in shafts > > Test standard
三.主要参数:The main parameters:
3.1 试验箱
3.1.1 U型压力计:测量试验箱的压力维持在0-12PA
3.1.2 温湿度计:测量试验箱的温度和湿度
3.1.3试验箱的结构:整体结构由混泥土墙面砌成,*层为1.22M,第二层为3.66M,顶层为2.24M. 外部尺寸:7.12M高x1.3M宽x2.5M长。
3.1.4墙面结构是密度为106lb/ft3(1698kd/m3) 的混泥土,其热传导率(k)在 21.1℃为0.38Btu(0.055W/mk)
3.1.5*、二层由203mm厚的增强普通重量的水泥构成.顶部由能够保证严密封性的墙面结构构成
3.1.6位于第二层的测量孔必须在*层测量孔(305mm by 610mm)的垂直上方.每个孔离箱子后面203mm,离箱子侧面102mm.
3.1 test chamber
3.1.1 u-shaped pressure gauge: measuring the pressure of the test chamber remain at 0-12 pa
3.1.2 temperature and humidity meter, measure the temperature and humidity test chamber
3.1.3 test chamber structure: overall structure by the concrete wall build by laying bricks or stones becomes, the first layer of 1.22 M, the second layer of 3.66 M, the top is 2.24 m. external size: 7.12 M high x1.3 M
Wide x2.5 M long.
3.1.4 wall structure is the density of 106 lb/ft3 (1698 kd/m3) of the concrete, the thermal conductivity (k) in 21.1 ℃ to 21.1 Btu (0.055 W/mk)
3.1.5 the first and second floor by 203 mm thick enhance the average weight of cement. The top is composed of can ensure strict sealing wall structure
3.1.6 is located in the second layer of hole must be in the first layer measurement hole (305 mm by 610 mm) above the vertical. Each hole 203 mm, from behind the box side is 102 mm away from the box.
:东莞中诺(中国台湾)质检仪器设备有限公司
Contact: dongguan (Taiwan) quality inspection instrument equipment co., LTD
(转)815
(艾新华)
http://www.ajh007.com
http://www.zon007.com
http://zonskyszajh.bmlink.com/
http://blog.sina.com.cn/u/3836926922