上海精导科学仪器有限公司
免费会员

当前位置:上海精导科学仪器有限公司>>水文环境采样>>采样器>> Kajak重力柱状采泥器不锈钢结构简单采样器

Kajak重力柱状采泥器不锈钢结构简单采样器

参  考  价面议
具体成交价以合同协议为准

产品型号

品       牌其他品牌

厂商性质代理商

所  在  地上海

联系方式:朱先生查看联系方式

更新时间:2022-05-30 15:23:24浏览次数:574次

联系我时,请告知来自 仪表网
同类优质产品更多>
产地 国产 加工定制
Kajak重力柱状采泥器不锈钢结构简单采样器,可作为重力柱状采泥器使用,也可通过选配件扩展为手动操作的柱状采泥器。Kajak柱状采泥器为一款可快速更换取样管的采泥器,对于需要大量底泥样本的用户来说十分适用。

Kajak重力柱状采泥器不锈钢结构简单采样器

Kajak柱状采泥器基于Kajak设计,可作为重力柱状采泥器使用,也可通过选配件扩展为手动操作的柱状采泥器。Kajak柱状采泥器为一款可快速更换取样管的采泥器,对于需要大量底泥样本的用户来说十分适用。


在水深小于4的情况下,可手动操作完成柱状底泥采样。采泥器主体上部可替换为推动轴杆,通过手动推动将采样管插入底泥。推动轴杆材质为AISI 316不锈钢,每段长2,建议zui大组装到4长度。

  • Kajak重力柱状采泥器不锈钢结构简单采样器

  • General:

  • The KC Kajak Sediment Core sampler is based on the Kajak design and can be used as line operated as well as hand operated sampler. With a wide range of accessories the system can be adjusted for various projects.


  • Models available:

  • The Kajak comes as a quick-change model, (13.030). This model speeds up the changing of corer tubes, very useful if you need a lot of samples. All parts are made of AISI 316 stainless steel. Model 13.030 can also be equipped with AISI 316 stainless steel corer tubes. An internal PP (polypropylene) liner can be inserted to the stainless steel tube for easy (and cheap) storing of many samples. The stainless steel tube can also hold the orange peel closing system (core catcher), which will prevent the sample from exiting.


  • Tubes and liners:

  • Standard delivery includes 1 pc acrylic sample tube. For very hard sea beds you can mount stainless steel tubes and also include internal liners if you need a large number of samples to be stored for later analysis.


  • Extension for hand operated Kajak:

  • Working in small depths up to 4 m, you can operate the Kajak by hand. The upper part of the line operated sampler can be exchanged with a pole in order to sample by manual insertion of the tube. The shafts are made of AISI 316 stainless steel tubes, each 2,0 m. They can be assembled to a maximum length of 6 m, recommended use max. 4 m.

  

 
 

 
Quick change system for the sample tube.
 
Locking system.
  
Steel tube with liner, orange peel and carver.
 

Increase of performance:

  • Adding top lead weights, 13.310 (each 1 kg, max. mounting 12 pcs = 12 kg) will increase penetration of the bottom sediment. For mounting you will need 2 pcs threaded bars 13.007.


会员登录

×

请输入账号

请输入密码

=

请输验证码

收藏该商铺

X
该信息已收藏!
标签:
保存成功

(空格分隔,最多3个,单个标签最多10个字符)

常用:

提示

X
您的留言已提交成功!我们将在第一时间回复您~
在线留言